Skip to main content

Installation Instructions


Let's start with the antenna support.

In the support we have the piece in H, which goes on the antenna.

img

This piece has holes on both sides, one of which will fit into the fork antenna.

img

After fitting, you must make a hole in the L-shaped part to fit it in the part that is on the antenna. The fit must happen so that the antenna is horizontal with the sticker, and the L-piece is horizontal as well.

Holes Φ 6.00

Antenna side img

The other part will be drilled to fit the forklift structure. It must be fitted into the side from the inside. The antennas must be positioned with adhesive horizontally and at the height compatible with the location where the employee will receive the RFID tag. It will be two antennas on the front and two on the back.

Before fitting the module, it will be necessary to connect the antennas to the module. The cables of extension already comes with the SMA connectors for TNC. Just plug in the places marked on the module and on the antenna.

img

To fit the module, the process occurs in the same way, but only Fixing the insulator, which is fixed to the module, to the roof of the structure or to the rear side.

img

Your kit comes with a DC/DC power supply. This source will be connected to a forklift post switch output. It can receive an input voltage of up to 60V and convert to 12V to power the module. Just connect the «input» (from the source) in any place that is post switch and the «12V output» (from the source) in the module.

Finally, it is necessary to fix the signal light. It is important to place it in a place where the operator can see the emitted signal.

img

img

You can fix it by opening the light protection box and screwing it into the structure, after Fixing just reassemble.

img

img

img